{"id":1515,"date":"2026-11-07T04:40:56","date_gmt":"2026-11-07T01:40:56","guid":{"rendered":"https:\/\/rastcpa.com\/ozelgeler\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\/"},"modified":"2026-11-07T04:40:56","modified_gmt":"2026-11-07T01:40:56","slug":"ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok","status":"publish","type":"ozelge","link":"https:\/\/rastcpa.com\/en\/ozelgeler\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\/","title":{"rendered":"GES Projesine Ek Protokolle Yaln\u0131zca G\u00fcne\u015f Paneli Tedarik Eden \u015eirketin \u0130\u015fi Y\u0131llara Sari \u0130n\u015faat Say\u0131lmaz, Tevkifat Yap\u0131lmaz"},"content":{"rendered":"<p>\u0130lgide kay\u0131tl\u0131 \u00f6zelge talep formu ve eklerinin tetkikinden;<\/p>\n<p>&#8211; 9\/2\/2024 tarihinde \u2026 Enerji A.\u015e. ile ba\u011fl\u0131 ortakl\u0131\u011f\u0131n\u0131z \u2026 Yenilenebilir Enerji Sistemleri A.\u015e. aras\u0131nda &#8220;\u2026Hibrit G\u00fcne\u015f Enerjisi Santrali M\u00fchendislik, Tedarik ve Yap\u0131m \u0130\u015fi (EPC S\u00f6zle\u015fmesi)&#8221; s\u00f6zle\u015fmesi imzaland\u0131\u011f\u0131,<\/p>\n<p>&#8211; S\u00f6zle\u015fme konusunun &#8220;\u2026 Hibrit G\u00fcne\u015f Enerjisi Santrali projesinin performans kriterlerinin de\u011ferlendirilerek in\u015faat, mekanik, elektrik ve elektronik i\u015flerinin ve ekipman tedariki ve m\u00fchendislik hizmetlerinin anahtar teslimi g\u00f6t\u00fcr\u00fc bedel esas\u0131na g\u00f6re yap\u0131lmas\u0131 ve tamamlanmas\u0131&#8221; oldu\u011fu,<\/p>\n<p>&#8211; \u2026 Yenilenebilir Enerji Sistemleri A.\u015e.&#8217;nin y\u00fcklenici olarak s\u00f6zle\u015fmeye g\u00f6re y\u00fcr\u00fctt\u00fc\u011f\u00fc GES yap\u0131m i\u015finin yer tesliminden kaynakl\u0131 sebeplerle ayn\u0131 y\u0131l i\u00e7erisinde bitirilemedi\u011finden i\u015fin y\u0131llara yayg\u0131n hale geldi\u011fi,<\/p>\n<p>&#8211; \u0130\u015fin devam\u0131 s\u0131ras\u0131nda \u015eirketinizce, \u2026 tarihli ek protokol yap\u0131larak \u2026 adet 550W &#8220;Sirius&#8221; marka g\u00fcne\u015f panelinin tedariki i\u00e7in \u2026. Enerji A.\u015e. (i\u015fveren) ve \u2026 Yenilenebilir Enerji Sistemleri A.\u015e. (y\u00fcklenici) ile anla\u015f\u0131ld\u0131\u011f\u0131,<\/p>\n<p>&#8211; \u0130\u015fbu protokol gere\u011fince \u2026 adet 550W &#8220;Sirius&#8221; marka g\u00fcne\u015f panelinin tedari\u011fi kar\u015f\u0131l\u0131\u011f\u0131nda \u00f6demenin \u2026 Enerji A.\u015e. (i\u015fveren) taraf\u0131ndan do\u011frudan \u015eirketinize yap\u0131laca\u011f\u0131 ve \u015eirketinizin s\u00f6z konusu yap\u0131m i\u015finde sorumlulu\u011funun g\u00fcne\u015f panellerinin tedari\u011fini yaparak \u00fcst y\u00fcklenicinin \u015fantiye sahas\u0131na tesliminden ibaret oldu\u011fu<\/p>\n<p>belirtilerek, \u015eirketinizin s\u00f6z konusu faaliyetinin Gelir Vergisi Kanununun 42 nci maddesine istinaden y\u0131llara sari in\u015faat ve onarma i\u015fi kapsam\u0131nda de\u011ferlendirilip de\u011ferlendirilemeyece\u011fi ve Kurumlar Vergisi Kanununun 15 inci maddesinin birinci f\u0131kras\u0131n\u0131n (a) bendi kapsam\u0131nda tevkifat yap\u0131l\u0131p yap\u0131lmayaca\u011f\u0131 hususlar\u0131nda g\u00f6r\u00fc\u015f talep edildi\u011fi anla\u015f\u0131lmaktad\u0131r.<\/p>\n<p>193 say\u0131l\u0131 Gelir Vergisi Kanununun 42 nci maddesinin birinci f\u0131kras\u0131nda, birden fazla takvim y\u0131l\u0131na sirayet eden in\u015faat (dekapaj i\u015fleri de in\u015faat i\u015fi say\u0131l\u0131r) ve onarma i\u015flerinde kar veya zarar\u0131n, i\u015fin bitti\u011fi y\u0131l kati olarak tespit edilece\u011fi ve tamam\u0131n\u0131n o y\u0131l\u0131n geliri say\u0131larak mezkur y\u0131l beyannamesinde g\u00f6sterilece\u011fi; 44 \u00fcnc\u00fc maddesinde ise in\u015faat ve onarma i\u015flerinde ge\u00e7ici ve kesin kabul usul\u00fcne tabi olan hallerde ge\u00e7ici kabul\u00fcn yap\u0131ld\u0131\u011f\u0131n\u0131 g\u00f6steren tutana\u011f\u0131n idarece onayland\u0131\u011f\u0131 tarihin; di\u011fer hallerde i\u015fin fiilen tamamland\u0131\u011f\u0131 veya fiilen b\u0131rak\u0131ld\u0131\u011f\u0131 tarihin bitim tarihi olarak kabul edilece\u011fi h\u00fckme ba\u011flanm\u0131\u015ft\u0131r.<\/p>\n<p>Bir i\u015fin Gelir Vergisi Kanununun 42 nci maddesi kapsam\u0131nda de\u011ferlendirilebilmesi i\u00e7in;<\/p>\n<p>&#8211; Faaliyet konusunun in\u015faat ve onarma i\u015fi olmas\u0131,<\/p>\n<p>&#8211; \u0130n\u015faat ve onarma i\u015finin birden fazla takvim y\u0131l\u0131na sirayet etmesi,<\/p>\n<p>&#8211; \u0130n\u015faat ve onarma i\u015finin taahh\u00fcde ba\u011fl\u0131 olarak yap\u0131lmas\u0131<\/p>\n<p>\u015fartlar\u0131n\u0131n bir arada aran\u0131lmas\u0131 gerekmektedir.<\/p>\n<p>Di\u011fer taraftan, an\u0131lan Kanunun 42 nci maddesi kapsam\u0131na giren i\u015fleri \u00fcstlenen m\u00fcteahhitlerce i\u015fin tamamen veya k\u0131smen ta\u015feronlara yapt\u0131r\u0131lmas\u0131 halinde, ta\u015feronlar\u0131n 42 nci madde kar\u015f\u0131s\u0131ndaki durumlar\u0131, taahh\u00fct ettikleri k\u0131sm\u0131n mahiyet itibar\u0131yla in\u015faat ve onar\u0131m i\u015fi kapsam\u0131nda olup olmad\u0131\u011f\u0131 ve s\u00fcre olarak y\u0131llara sirayet edip etmedi\u011fine g\u00f6re tespit edilecektir.<\/p>\n<p>\u00d6te yandan, 4734 say\u0131l\u0131 Kamu \u0130hale Kanununun 4 \u00fcnc\u00fc maddesinde; &#8220;yap\u0131m&#8221; bina, karayolu, demiryolu, otoyol, havaliman\u0131, r\u0131ht\u0131m, liman, tersane, k\u00f6pr\u00fc, t\u00fcnel, metro, viyad\u00fck, spor tesisi, alt yap\u0131, boru iletim hatt\u0131, haberle\u015fme ve enerji nakil hatt\u0131, baraj, enerji santrali, rafineri tesisi, sulama tesisi, toprak \u0131slah\u0131, ta\u015fk\u0131n koruma ve dekapaj gibi her t\u00fcrl\u00fc in\u015faat i\u015fleri ve bu i\u015flerle ilgili tesisat, imalat, ihzarat, nakliye, tamamlama, b\u00fcy\u00fck onar\u0131m, restorasyon, \u00e7evre d\u00fczenlemesi, sondaj, y\u0131kma, g\u00fc\u00e7lendirme ve montaj i\u015fleri ile benzeri yap\u0131m i\u015fleri olarak tan\u0131mlanm\u0131\u015ft\u0131r.<\/p>\n<p>\u0130lgide kay\u0131tl\u0131 \u00f6zelge talep formu ekinde yer alan i\u015fveren, y\u00fcklenici ve \u015eirketiniz aras\u0131nda yap\u0131lan &#8220;Ek Protokol-1&#8243;in incelenmesi neticesinde; s\u00f6z konusu protokol\u00fcn \u2026 tarihinde imzalanan ana s\u00f6zle\u015fmenin (EPC S\u00f6zle\u015fmesi) eki ve ayr\u0131lmaz bir par\u00e7as\u0131 olarak d\u00fczenlendi\u011fi, y\u00fcklenicinin; ana s\u00f6zle\u015fmedeki y\u00fck\u00fcml\u00fcl\u00fcklerinin yan\u0131 s\u0131ra \u015eirketinize ait g\u00fcne\u015f panellerinin tedari\u011fini \u00fcstlendi\u011fi ve g\u00fcne\u015f panellerinin tedari\u011finden \u015eirketiniz ile birlikte m\u00fcteselsilen sorumlu oldu\u011fu, ancak panellerin \u00fcretilmesi, tedari\u011fi, teslimi, kurulumu gibi her t\u00fcrl\u00fc sorumluluktan m\u00fcnhas\u0131ran sorumlu olaca\u011f\u0131, i\u015fverenin panele ili\u015fkin hakedi\u015f bedellerini y\u00fcklenici ad\u0131na kendisi \u00f6deyece\u011fi ve ana s\u00f6zle\u015fme (EPC S\u00f6zle\u015fmesi) bedelinden d\u00fc\u015ferek hakedi\u015f mebla\u011f\u0131na yans\u0131taca\u011f\u0131, s\u00f6z konusu ek protokol ile \u015eirketinizin ana s\u00f6zle\u015fmenin (EPC S\u00f6zle\u015fmesi) taraf\u0131 haline gelmeyece\u011fi hususunda anla\u015fmaya var\u0131ld\u0131\u011f\u0131 anla\u015f\u0131lm\u0131\u015ft\u0131r.<\/p>\n<p>Bu h\u00fck\u00fcm ve a\u00e7\u0131klamalar \u00e7er\u00e7evesinde, \u2026 Enerji A.\u015e. ile ba\u011fl\u0131 ortakl\u0131\u011f\u0131n\u0131z \u2026 Yenilenebilir Enerji Sistemleri A.\u015e. aras\u0131nda imzalanan s\u00f6zle\u015fmeye ek olarak d\u00fczenlenen ek protokol, s\u00f6z konusu i\u015fin mal teslimi (g\u00fcne\u015f panelleri tedari\u011fi) ile s\u0131n\u0131rl\u0131 olmas\u0131 nedeniyle bahse konu protokol kapsam\u0131nda \u00fcstlenilen i\u015fin y\u0131llara sari in\u015faat ve onar\u0131m i\u015fi olarak de\u011ferlendirilmesi m\u00fcmk\u00fcn bulunmad\u0131\u011f\u0131ndan, bu i\u015fe ili\u015fkin \u015eirketinize yap\u0131lan \u00f6demeler \u00fczerinden gelir vergisi kesintisinin yap\u0131lmamas\u0131 gerekmektedir.<\/p>\n<p>Bilgi edinilmesini rica ederim.<\/p>","protected":false},"template":"","meta":{"oz_tarih":"2025-06-18","oz_sayi":"E-38418978-120[42-2025\/4]-","oz_idare":"Ankara Defterdarl\u0131\u011f\u0131, Gelir Kanunlar\u0131 Gelir Vergileri Grup M\u00fcd\u00fcrl\u00fc\u011f\u00fc","oz_idare_en":"Ankara Tax Office Directorate, Revenue Laws Income Taxes Group Directorate","oz_kanun":"Gelir Vergisi Kanunu (193)","oz_kanun_en":"Income Tax Law (No. 193)","oz_konu":"Yap\u0131lan i\u015fin y\u0131llara sari in\u015faat i\u015fi olarak de\u011ferlendirilip de\u011ferlendirilemeyece\u011fi ve yap\u0131lacak \u00f6demeler \u00fczerinden vergi kesintisi yap\u0131l\u0131p yap\u0131lmayaca\u011f\u0131","oz_konu_en":"Whether the work is a multi-year construction work and whether tax is to be withheld on payments","oz_gib_url":"https:\/\/www.gib.gov.tr\/mevzuat\/kanun\/433\/ozelge\/38718","oz_durum":"guncel","oz_not":"<p>Ba\u011fl\u0131 ortakl\u0131\u011f\u0131n\u0131n y\u00fcklenicisi oldu\u011fu hibrit GES EPC i\u015fine sonradan imzalanan ek protokolle g\u00fcne\u015f paneli tedarik\u00e7isi olarak kat\u0131lan ve \u00f6demeyi do\u011frudan i\u015fverenden alacak bir \u015firket, bu faaliyetinin GVK 42 kapsam\u0131nda y\u0131llara sari in\u015faat i\u015fi say\u0131l\u0131p say\u0131lmayaca\u011f\u0131n\u0131 ve KVK 15\/1-a kapsam\u0131nda tevkifat yap\u0131l\u0131p yap\u0131lmayaca\u011f\u0131n\u0131 sormu\u015ftur.<\/p>\n<p>\u0130dare, GVK 42 i\u00e7in faaliyetin in\u015faat ve onarma i\u015fi olmas\u0131, birden fazla takvim y\u0131l\u0131na yay\u0131lmas\u0131 ve taahh\u00fcde ba\u011fl\u0131 yap\u0131lmas\u0131 \u015fartlar\u0131n\u0131n birlikte aranaca\u011f\u0131n\u0131 belirtmi\u015ftir. Ek protokol kapsam\u0131nda \u015firketin \u00fcstlendi\u011fi i\u015f g\u00fcne\u015f paneli tedariki \u015feklinde mal teslimiyle s\u0131n\u0131rl\u0131 oldu\u011fundan y\u0131llara sari in\u015faat i\u015fi say\u0131lmaz; bu i\u015fe ili\u015fkin \u00f6demelerden vergi kesintisi yap\u0131lmaz.<\/p>\n<p>\u00d6zelge, enerji santrali projelerinde ekipman tedarik eden \u015firketleri ve \u00f6deme yapan i\u015fverenleri ilgilendirir.<\/p>","oz_en_title":"A Company Only Supplying Solar Panels to a Solar Plant Project Under an Additional Protocol Is Not Doing Multi-Year Construction Work; No Withholding Applies","oz_en_not":"<p>A company that joined a hybrid solar power plant EPC project, in which its subsidiary is the contractor, as a solar panel supplier under a later additional protocol, and that will receive payment directly from the employer, asked whether this activity is a multi-year construction work under Income Tax Law Article 42 and whether withholding applies under Corporate Tax Law Article 15\/1-a.<\/p>\n<p>The Administration stated that Article 42 requires the activity to be construction and repair work, extend over more than one calendar year and be carried out under a commitment, all together. Since the work undertaken by the company under the additional protocol is limited to a delivery of goods in the form of solar panel supply, it is not multi-year construction work, and no tax is withheld from payments for this work.<\/p>\n<p>The ruling is relevant to companies supplying equipment to power plant projects and to employers making payments.<\/p>","oz_en_body":"<p>From examination of the ruling request form referred to above and its annexes, stating that:<\/p>\n<p>- on 9\/2\/2024 a \"\u2026 Hybrid Solar Power Plant Engineering, Procurement and Construction Work (EPC Contract)\" was signed between \u2026 Enerji A.\u015e. and your subsidiary \u2026 Yenilenebilir Enerji Sistemleri A.\u015e.,<\/p>\n<p>- the subject of the contract is \"carrying out and completing, on a turnkey lump-sum basis, the construction, mechanical, electrical and electronic works, equipment supply and engineering services of the \u2026 Hybrid Solar Power Plant project, considering its performance criteria\",<\/p>\n<p>- since the solar plant construction work carried out by \u2026 Yenilenebilir Enerji Sistemleri A.\u015e. as contractor under the contract could not be completed within the same year for reasons arising from site delivery, the work became multi-year,<\/p>\n<p>- during the work, your company agreed with \u2026. Enerji A.\u015e. (employer) and \u2026 Yenilenebilir Enerji Sistemleri A.\u015e. (contractor) by an additional protocol dated \u2026 for the supply of \u2026 \"Sirius\" brand 550W solar panels,<\/p>\n<p>- under this protocol, payment for the supply of \u2026 \"Sirius\" brand 550W solar panels will be made directly to your company by \u2026 Enerji A.\u015e. (employer), and your company's responsibility in that construction work consists of supplying the solar panels and delivering them to the main contractor's site,<\/p>\n<p>it is understood that an opinion is requested on whether your company's activity can be considered multi-year construction and repair work under Article 42 of the Income Tax Law, and whether withholding is to be applied under sub-paragraph (a) of the first paragraph of Article 15 of the Corporate Tax Law.<\/p>\n<p>The first paragraph of Article 42 of Income Tax Law No. 193 provides that in construction (stripping works are also deemed construction work) and repair works extending over more than one calendar year, profit or loss is determined definitively in the year the work is completed and the whole is deemed income of that year and shown on that year's return; Article 44 provides that in construction and repair works subject to provisional and final acceptance, the date on which the minutes showing provisional acceptance are approved by the authority, and in other cases the date on which the work is actually completed or actually abandoned, is accepted as the completion date.<\/p>\n<p>For a work to be considered within Article 42 of the Income Tax Law, the following conditions must be met together:<\/p>\n<p>- the activity must be construction and repair work,<\/p>\n<p>- the construction and repair work must extend over more than one calendar year,<\/p>\n<p>- the construction and repair work must be carried out under a commitment.<\/p>\n<p>On the other hand, where contractors undertaking works within Article 42 of that Law have the work carried out wholly or partly by subcontractors, the position of the subcontractors under Article 42 will be determined according to whether the part they have undertaken is by nature construction and repair work and whether it extends over years in terms of duration.<\/p>\n<p>Furthermore, Article 4 of Public Procurement Law No. 4734 defines \"construction\" as all kinds of construction works such as buildings, highways, railways, motorways, airports, quays, ports, shipyards, bridges, tunnels, metros, viaducts, sports facilities, infrastructure, pipelines, communication and power transmission lines, dams, power plants, refinery facilities, irrigation facilities, land reclamation, flood protection and stripping, and installation, manufacturing, preparation, transport, completion, major repair, restoration, landscaping, drilling, demolition, strengthening and assembly works related to these works, and similar construction works.<\/p>\n<p>On examination of \"Additional Protocol-1\" between the employer, the contractor and your company, annexed to the ruling request form referred to above, it is understood that the protocol was issued as an annex and integral part of the main contract (EPC Contract) signed on \u2026, that the contractor, in addition to its obligations under the main contract, undertook the supply of solar panels belonging to your company and is jointly and severally liable with your company for the supply of the solar panels, but will be exclusively responsible for all responsibilities such as production, supply, delivery and installation of the panels, that the employer will itself pay the progress billing amounts for the panels on behalf of the contractor and reflect them in the progress billing amount by deducting them from the main contract (EPC Contract) price, and that it was agreed that your company would not become a party to the main contract (EPC Contract) by this additional protocol.<\/p>\n<p>Within the framework of these provisions and explanations, since the work undertaken under the additional protocol issued in addition to the contract signed between \u2026 Enerji A.\u015e. and your subsidiary \u2026 Yenilenebilir Enerji Sistemleri A.\u015e. is limited to a delivery of goods (supply of solar panels), and therefore cannot be considered multi-year construction and repair work, no income tax is to be withheld from payments made to your company for this work.<\/p>\n<p>For your information.<\/p>","oz_ilgili":0,"footnotes":""},"ozelge_konu":[34,27],"ozelge_madde":[176,204],"class_list":["post-1515","ozelge","type-ozelge","status-publish","hentry","ozelge_konu-gelir-vergisi","ozelge_konu-kurumlar-vergisi","ozelge_madde-gvk-md-42","ozelge_madde-kvk-md-15-1-a"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>GES Projesine Ek Protokolle Yaln\u0131zca G\u00fcne\u015f Paneli Tedarik Eden \u015eirketin \u0130\u015fi Y\u0131llara Sari \u0130n\u015faat Say\u0131lmaz, Tevkifat Yap\u0131lmaz - Rast Partners<\/title>\n<meta name=\"robots\" content=\"noindex, follow\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GES Projesine Ek Protokolle Yaln\u0131zca G\u00fcne\u015f Paneli Tedarik Eden \u015eirketin \u0130\u015fi Y\u0131llara Sari \u0130n\u015faat Say\u0131lmaz, Tevkifat Yap\u0131lmaz - Rast Partners\" \/>\n<meta property=\"og:description\" content=\"\u0130lgide kay\u0131tl\u0131 \u00f6zelge talep formu ve eklerinin tetkikinden; &#8211; 9\/2\/2024 tarihinde \u2026 Enerji A.\u015e. ile ba\u011fl\u0131 ortakl\u0131\u011f\u0131n\u0131z \u2026 Yenilenebilir Enerji Sistemleri A.\u015e. aras\u0131nda &#8220;\u2026Hibrit G\u00fcne\u015f Enerjisi Santrali M\u00fchendislik, Tedarik ve Yap\u0131m \u0130\u015fi (EPC S\u00f6zle\u015fmesi)&#8221; s\u00f6zle\u015fmesi imzaland\u0131\u011f\u0131, &#8211; S\u00f6zle\u015fme konusunun &#8220;\u2026 Hibrit G\u00fcne\u015f Enerjisi Santrali projesinin performans kriterlerinin de\u011ferlendirilerek in\u015faat, mekanik, elektrik ve elektronik i\u015flerinin ve [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rastcpa.com\/en\/ozelgeler\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\/\" \/>\n<meta property=\"og:site_name\" content=\"Rast Partners\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/rastcpa.com\/wp-content\/uploads\/2026\/11\/rast-hero-poster.jpg\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rastcpa.com\\\/ozelgeler\\\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\\\/\",\"url\":\"https:\\\/\\\/rastcpa.com\\\/ozelgeler\\\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\\\/\",\"name\":\"GES Projesine Ek Protokolle Yaln\u0131zca G\u00fcne\u015f Paneli Tedarik Eden \u015eirketin \u0130\u015fi Y\u0131llara Sari \u0130n\u015faat Say\u0131lmaz, Tevkifat Yap\u0131lmaz - Rast Partners\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rastcpa.com\\\/#website\"},\"datePublished\":\"2026-11-07T01:40:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rastcpa.com\\\/ozelgeler\\\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/rastcpa.com\\\/ozelgeler\\\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rastcpa.com\\\/ozelgeler\\\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Anasayfa\",\"item\":\"https:\\\/\\\/rastcpa.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00d6zelgeler\",\"item\":\"https:\\\/\\\/rastcpa.com\\\/ozelgeler\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"GES Projesine Ek Protokolle Yaln\u0131zca G\u00fcne\u015f Paneli Tedarik Eden \u015eirketin \u0130\u015fi Y\u0131llara Sari \u0130n\u015faat Say\u0131lmaz, Tevkifat Yap\u0131lmaz\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rastcpa.com\\\/#website\",\"url\":\"https:\\\/\\\/rastcpa.com\\\/\",\"name\":\"Rast Partners\",\"description\":\"Muhasebe, Bordro ve Dan\u0131\u015fmanl\u0131k\",\"publisher\":{\"@id\":\"https:\\\/\\\/rastcpa.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/rastcpa.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"AccountingService\"],\"@id\":\"https:\\\/\\\/rastcpa.com\\\/#organization\",\"name\":\"Rast Partners\",\"alternateName\":\"Rast SMMM\",\"url\":\"https:\\\/\\\/rastcpa.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/rastcpa.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/rast-partners-logo-kare.png\",\"contentUrl\":\"https:\\\/\\\/rastcpa.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/rast-partners-logo-kare.png\",\"width\":1024,\"height\":1024,\"caption\":\"Rast Partners\"},\"image\":{\"@id\":\"https:\\\/\\\/rastcpa.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/rast-partners-logo-kare.png\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/rast-partners\"],\"email\":\"rast@rastcpa.com\",\"telephone\":\"+90 212 367 45 30\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Maslak Mah. Bilim Sk. Sun Plaza No: 5A \u0130\u00e7 Kap\u0131 No: 52\",\"addressLocality\":\"Sar\u0131yer\",\"addressRegion\":\"\u0130stanbul\",\"postalCode\":\"34398\",\"addressCountry\":\"TR\"},\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\"],\"opens\":\"09:00\",\"closes\":\"18:00\"}],\"areaServed\":{\"@type\":\"Country\",\"name\":\"T\u00fcrkiye\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"GES Projesine Ek Protokolle Yaln\u0131zca G\u00fcne\u015f Paneli Tedarik Eden \u015eirketin \u0130\u015fi Y\u0131llara Sari \u0130n\u015faat Say\u0131lmaz, Tevkifat Yap\u0131lmaz - Rast Partners","robots":{"index":"noindex","follow":"follow"},"og_locale":"en_US","og_type":"article","og_title":"GES Projesine Ek Protokolle Yaln\u0131zca G\u00fcne\u015f Paneli Tedarik Eden \u015eirketin \u0130\u015fi Y\u0131llara Sari \u0130n\u015faat Say\u0131lmaz, Tevkifat Yap\u0131lmaz - Rast Partners","og_description":"\u0130lgide kay\u0131tl\u0131 \u00f6zelge talep formu ve eklerinin tetkikinden; &#8211; 9\/2\/2024 tarihinde \u2026 Enerji A.\u015e. ile ba\u011fl\u0131 ortakl\u0131\u011f\u0131n\u0131z \u2026 Yenilenebilir Enerji Sistemleri A.\u015e. aras\u0131nda &#8220;\u2026Hibrit G\u00fcne\u015f Enerjisi Santrali M\u00fchendislik, Tedarik ve Yap\u0131m \u0130\u015fi (EPC S\u00f6zle\u015fmesi)&#8221; s\u00f6zle\u015fmesi imzaland\u0131\u011f\u0131, &#8211; S\u00f6zle\u015fme konusunun &#8220;\u2026 Hibrit G\u00fcne\u015f Enerjisi Santrali projesinin performans kriterlerinin de\u011ferlendirilerek in\u015faat, mekanik, elektrik ve elektronik i\u015flerinin ve [&hellip;]","og_url":"https:\/\/rastcpa.com\/en\/ozelgeler\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\/","og_site_name":"Rast Partners","twitter_card":"summary_large_image","twitter_image":"https:\/\/rastcpa.com\/wp-content\/uploads\/2026\/11\/rast-hero-poster.jpg","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/rastcpa.com\/ozelgeler\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\/","url":"https:\/\/rastcpa.com\/ozelgeler\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\/","name":"GES Projesine Ek Protokolle Yaln\u0131zca G\u00fcne\u015f Paneli Tedarik Eden \u015eirketin \u0130\u015fi Y\u0131llara Sari \u0130n\u015faat Say\u0131lmaz, Tevkifat Yap\u0131lmaz - Rast Partners","isPartOf":{"@id":"https:\/\/rastcpa.com\/#website"},"datePublished":"2026-11-07T01:40:56+00:00","breadcrumb":{"@id":"https:\/\/rastcpa.com\/ozelgeler\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rastcpa.com\/ozelgeler\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/rastcpa.com\/ozelgeler\/ges-ek-protokol-gunes-paneli-tedariki-yillara-sari-insaat-degil-tevkifat-yok\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Anasayfa","item":"https:\/\/rastcpa.com\/"},{"@type":"ListItem","position":2,"name":"\u00d6zelgeler","item":"https:\/\/rastcpa.com\/ozelgeler\/"},{"@type":"ListItem","position":3,"name":"GES Projesine Ek Protokolle Yaln\u0131zca G\u00fcne\u015f Paneli Tedarik Eden \u015eirketin \u0130\u015fi Y\u0131llara Sari \u0130n\u015faat Say\u0131lmaz, Tevkifat Yap\u0131lmaz"}]},{"@type":"WebSite","@id":"https:\/\/rastcpa.com\/#website","url":"https:\/\/rastcpa.com\/","name":"Rast Partners","description":"Muhasebe, Bordro ve Dan\u0131\u015fmanl\u0131k","publisher":{"@id":"https:\/\/rastcpa.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rastcpa.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","AccountingService"],"@id":"https:\/\/rastcpa.com\/#organization","name":"Rast Partners","alternateName":"Rast SMMM","url":"https:\/\/rastcpa.com\/","logo":{"@type":"ImageObject","url":"https:\/\/rastcpa.com\/wp-content\/uploads\/2026\/11\/rast-partners-logo-kare.png","contentUrl":"https:\/\/rastcpa.com\/wp-content\/uploads\/2026\/11\/rast-partners-logo-kare.png","width":1024,"height":1024,"caption":"Rast Partners"},"image":{"@id":"https:\/\/rastcpa.com\/wp-content\/uploads\/2026\/11\/rast-partners-logo-kare.png"},"sameAs":["https:\/\/www.linkedin.com\/company\/rast-partners"],"email":"rast@rastcpa.com","telephone":"+90 212 367 45 30","address":{"@type":"PostalAddress","streetAddress":"Maslak Mah. Bilim Sk. Sun Plaza No: 5A \u0130\u00e7 Kap\u0131 No: 52","addressLocality":"Sar\u0131yer","addressRegion":"\u0130stanbul","postalCode":"34398","addressCountry":"TR"},"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday"],"opens":"09:00","closes":"18:00"}],"areaServed":{"@type":"Country","name":"T\u00fcrkiye"}}]}},"_links":{"self":[{"href":"https:\/\/rastcpa.com\/en\/wp-json\/wp\/v2\/ozelge\/1515","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rastcpa.com\/en\/wp-json\/wp\/v2\/ozelge"}],"about":[{"href":"https:\/\/rastcpa.com\/en\/wp-json\/wp\/v2\/types\/ozelge"}],"version-history":[{"count":0,"href":"https:\/\/rastcpa.com\/en\/wp-json\/wp\/v2\/ozelge\/1515\/revisions"}],"wp:attachment":[{"href":"https:\/\/rastcpa.com\/en\/wp-json\/wp\/v2\/media?parent=1515"}],"wp:term":[{"taxonomy":"ozelge_konu","embeddable":true,"href":"https:\/\/rastcpa.com\/en\/wp-json\/wp\/v2\/ozelge_konu?post=1515"},{"taxonomy":"ozelge_madde","embeddable":true,"href":"https:\/\/rastcpa.com\/en\/wp-json\/wp\/v2\/ozelge_madde?post=1515"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}